Archives
Categories
Monthly Archives: December 2013
Mast Step and Forward Bulkhead
The mast step was sealed in polyester and glass matting, and while looked OK it had a hollow sound when tapped. I opted to replace the mast step too. As the forward bulkhead was bonded to the mast step this … Continue reading
Posted in Ariel Refit
Leave a comment
Cockpit Sole and Floor Boards
The original sole was marine ply sitting on what I think was Douglas floor boards. Both were showing plenty of signs of decay. As I had committed to replacing the keel band the floors need to be removed to assist … Continue reading
Posted in Ariel Refit
Leave a comment