Category Archives: Ariel Refit

Postes relating to the refit

Evening sail with Alan Leddy

A beautiful evening sail with Alan who is great company and a handy photographer. Great conversation, lovely sunset and an enjoyable sail, oh and great pictures.

Posted in Ariel Refit | Leave a comment

2016 Season Opened

Boat launched and taken in a shakedown sail.

Posted in Ariel Refit | Leave a comment

Donal and Geariod cruise the Mulditch Bank.

On a Sunny September the two young men cruised the Mulditch Bank. While the sun was out we had 14 knots of breeze form the south, along with a south running tide this made for a grand wind against tide … Continue reading

Posted in Ariel Refit | 1 Comment

Launched

Ariel of Greystones finally launched

Posted in Ariel Refit | Leave a comment

Rudder

The rudder was stripped down. I also stripped the tiller fitting and had it hot dipped. The rudder was made from layers of marine ply and is still in good shape. I stripped back to clean wood and sealed with … Continue reading

Posted in Ariel Refit | Leave a comment

Mast Step and Forward Bulkhead

The mast step was sealed in polyester and glass matting, and while looked OK it had a hollow sound when tapped. I opted to replace  the mast step too. As the forward bulkhead was bonded to the mast step this … Continue reading

Posted in Ariel Refit | Leave a comment

Cockpit Sole and Floor Boards

The original sole was marine ply sitting on what I think was Douglas floor boards. Both were showing plenty of signs of decay. As I had committed to replacing the keel band the floors need to be removed to assist … Continue reading

Posted in Ariel Refit | Leave a comment

Keel Band Replacement

The new keel band is fabricated out of 4mm 316 stainless steel. I made a new bobstay fitting too. The band will be fixed with new 8mm CSK machine screws backed with a length of 50mm x 4mm 316 stainless … Continue reading

Posted in Ariel Refit | Leave a comment

Heel Extension

Posted in Ariel Refit | Leave a comment

Keel Band

As the keel band was heavily rusted, it needs to be replaced at sometime so why not now as i have the ballast out. It was bedded in with denso tape and as horrible as it is to work with … Continue reading

Posted in Ariel Refit | Leave a comment